| NEW CONCRETE |
| - compression strength min.
20 N/mm2 (B200, C16) - 28 days after casting - clean, dry surface - no cement paste is allowed on the top of surface - apply vacuum-cleaner if necessary |
| REQUIREMENTS AND PREPARATION OF OLD CONCRETE BASE |
- compression strength min. 20 N/mm2 , clean, dry surface |
| How to make clean surface? |
Only mechanical method could be
effective! |

old, deeply soiled concrete surface
preparation with milling cutter
